The all-new Turney Energy Center, to be built by Associated Electric Cooperative near Turney, Missouri, will meet the energy needs of members across the region with a net output between 420 and 445 MW. When complete, Turney Energy Center will be the most advanced commercially operated combustion turbine in the state. The facility will operate as a natural gas peaking unit, which will not run all the time, and will be available to quick-start and run on-demand during periods of peak energy use.

Turney Energy Center’s ideal location, approximately 3 miles southwest of Turney, Missouri, offers the best proximity to natural gas supply lines and cooperative high-voltage transmission lines, allowing Associated to construct the energy center at the lowest-cost possible to members.

Fast Facts & Project Guide: Turney Energy Center

  • Efficient, powerful, simple-cycle combustion turbine technology
  • Quick-start capability
  • Net output of 420–445 MW
  • Selective catalytic reducers (SCRs) installed to reduce nitrogen oxide emissions
  • Unit can burn fuel oil and blend up to 30% hydrogen
  • Energy center online by 2026–2027
  • Estimated total project cost of $520 million

Frequently Asked Questions (FAQs)